Hospital Chiller Pipework Upgrade

Hospital Chiller Pipework Upgrade The ChallengeA local hospital required new pipework for two chillers installed, pressure-tested, and commissioned on an exceptionally tight turnaround without disrupting daily operations. The SolutionKentronix fabricated and installed 6″ flow and return connections for the twin-chiller system, completed rigorous pressure testing, and carried out final commissioning to bring both units fully […]

Complex Fabrication Delivered Against a Tight Deadline

Complex Fabrication Delivered Against a Tight Deadline Project Overview Kentronix was approached with an urgent fabrication project requiring a rapid turnaround before the Christmas shutdown. Despite the challenging timescale, our team accepted the project with confidence, drawing on our in-house fabrication, machining and welding capabilities to deliver on schedule. The Challenge The client required a […]

Mild Steel Flooring Installation for a Local Water Company

Mild Steel Flooring Installation for a Local Water Company Project Overview We recently completed the replacement of ageing flooring for a local water company, installing a new mild steel flooring system designed to improve safety, durability and long-term performance. The Challenge The existing flooring had deteriorated over time, creating potential safety risks for personnel working […]

Call Now Button