Hospital Chiller Pipework Upgrade

The Challenge
A local hospital required new pipework for two chillers installed, pressure-tested, and commissioned on an exceptionally tight turnaround without disrupting daily operations.

The Solution
Kentronix fabricated and installed 6″ flow and return connections for the twin-chiller system, completed rigorous pressure testing, and carried out final commissioning to bring both units fully online within deadline.

The Result
A turnkey, fully compliant cooling system delivered on time with zero operational downtime.